The end of this week (only 7 weeks since we broke ground) saw more electric and plumbing run inside the house. I actually made decisions on switch, outlet and light locations and I think it is turning out well! The county came and put in the culvert for the driveway. And then today our well was dug. The boys (and I) were fascinated by the water gushing out of the top of the well. It was very dirty water pouring out from under ground and Zach looked at me at one point and said, "We have to drink that?!?"
And, both of the older boys got to drive the skid steer.






No comments:
Post a Comment